Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2019 | ELECTRIC - CONSTRUCTION POWER | Approved | The TEP clearance code is ECO. | |
| 09/18/2019 | ELECTRIC - CONSTRUCTION POWER | Cancelled | CANCELLED BY CONTRACTOR |