Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2019 | PLUMBING - FINAL | Approved | All corrections complete | |
| 05/16/2019 | PLUMBING - FINAL | Correction Required | Secure all PEX where accessible at 32” OC per manuf using manufacturers listed pipe clamps. Install 18” of copper at the water heater before attaching copper to flex at gas water heater. Manuf req to keep PEX from melting. |