Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2019 | BUILDING PRE-SLAB | Approved | make sure plumbing pipes are wrapped all the way through the concrete. |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2019 | BUILDING PRE-SLAB | Approved | make sure plumbing pipes are wrapped all the way through the concrete. |