Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM03373
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/16/2021 | ENGINEERING - FINAL | Approved | ||
11/15/2021 | ENGINEERING - FINAL | Partial Approval | IS PARTIAL APPROVED OK FOR A TEMPORARY CERTIFICATE OF OCCUPANCY BUT NOT FOR FINAL. THE SITE WILL BE CHECKED FOR AN ACTIVE DEVELOPMENT PACKAGE, IF IT IS CLOSED OR APPROVED THIS COMBO WILL BE APPROVED WITH ALL OTHER PERMITS BY ENGINEERING. | |
12/07/2020 | ENGINEERING - FINAL | Partial Approval | PARTIAL AT THIS TIME, OK FOR TCO. FINAL NOT TO BE GIVEN TILL THE DEVELOPMENT PACKAGE HAS BEEN COMPLETED. | |
12/01/2020 | ENGINEERING - FINAL | Partial Approval | PARTIAL AT THIS TIME, OK FOR A TCO FOR ALL EXISTING AND COMPLETED STRUCTURES WITHIN THIS SITE. THE CONTRACTOR WILL BE PLACING THE NEW PAVEMENT DOWN OVER THE NEXT MONTH, THIS WORK WILL BE DONE WHILE THE SITE IS CLOSED TO THE PUBLIC. FINAL NOT TO BE GIVEN TILL ALL OF THE STRUCTURES HAVE BE CONSTRUCTED AND ALL PAVEMENT HAS BEEN PLACED THROUGHOUT THIS SITE. |