Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2019 | FRAMING | Approved | ||
| 07/17/2019 | FRAMING | Denied | 1- Flex duct in master bathroom not connected. 2- Seal the top plate water penetration east of front door. |
|
| 07/15/2019 | FRAMING | Denied | 1- Shall provide (3) sided blocking on the forced air vents in master bathroom. 2- Shall seal all top plate penetrations with fire rated foam or caulk there is a few without. |
|
| 06/19/2019 | FRAMING | Prior to Intermediates | TRUSS PLAN MUST BE APPROVED PRIOR TO INTERMEDIATE INSPECTIONS |