Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2019 | PLUMBING - FINAL | Approved | Clear gas meter Verbal clearance called in at 1:33 pm |
|
| 05/01/2019 | PLUMBING - FINAL | Denied | 1- See comments from the inspection performed on 04/30/2019 and make corrections. 2- knocked on door, no answer |
|
| 04/30/2019 | PLUMBING - FINAL | Denied | 1- Shall provide a carbon monoxide detector and locate it in the hallway. 2- Shall provide the required test gage of 15 lbs with 1/10th increments. 3- Shall provide a sediment trap at water heater gas supply. 4- Shall extend and terminate the water heater T & P drain 6 inches above sub grade. |