Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2019 | ELECTRIC - FINAL | Not ready for Inspection | Called message # at 8:20 and 9:10. No answer and message availability was full. Went to bank and spoke with manager. Machines been being used for over a week. Still having problems with north side walk up atm. Recall inspection. |
|
| 07/05/2019 | ELECTRIC - FINAL | Partial Approval | Needs re-inpspection for work that had been redone. | |
| 07/03/2019 | ELECTRIC - FINAL | Approved | ||
| 06/21/2019 | ELECTRIC - FINAL | Not ready for Inspection | Electrical not properly wired.Provide connectors were conduit enter subpanel, no double, triple lugging of breakers. | |
| 06/20/2019 | ELECTRIC - FINAL | Not ready for Inspection | Per will the kiosk is on a broken down Semi 200 miles away, |