Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2019 | BUILDING PRE-SLAB | Approved | make sure to wrap ABS piping before pouring concrete as only sections of them are currently wrapped, any part of piping within concrete needs to be wrapped. |