Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 07/12/2019 | PLUMBING - INTERMEDIATE | Partial Approval | both pex piping and ABS piping needs to be under water test at time of inspection, also closet ring needs to be installed in front bathroom. | |
| 07/08/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Building locked up/no one on site at 12:10pm. No message left, recall and leave message with access instructions. | |
| 07/03/2019 | PLUMBING - INTERMEDIATE | Correction Required | Bathroom lavy vent to be 6" above the flood rim of the sink bowl. Install Closet ring screw to concrete at the toilet. Fill all plumbing pipes with water VTR for test. Water pipes shall be under working pressure. PEX is to be secured every 32". |