Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2019 | ELECTRIC - RECONNECT | Approved | ||
| 05/06/2019 | ELECTRIC - RECONNECT | Partial Approval | house is clearly being remodeled. Disconnect all breakers but temporary GFCI breaker at the panel for temp/construction power clearance. | |
| 04/29/2019 | ELECTRIC - RECONNECT | Denied | 1. Cap off ends of dryer circuit wire. 2. Install smoke detectors in all bedrooms and hallway, along with a carbon monoxide detector in the hallway. 3. Tape exposed end of unlanded circuit wire in main panel. 4. Install 20 amp gfi at bottom of panel for construction power. |