Permit: T19CM02888

Parcel: 138241650

Inspection Status: Approved

Inspection History: FIRE - ALARM FINAL

Permit Number - T19CM02888

Inspection Description - FIRE - ALARM FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
09/10/2019 FIRE - ALARM FINAL Approved Approved by CB 9/6/19
07/26/2019 FIRE - ALARM FINAL Partial Approval Only tested smoke and pull station. Notification appliances all worked. Need to test the following by 7/29 or 7/30 in the morning prior to opening.
-Need to test duct smokes. These do not need to pass by monday. It may take a while to resolve the issues with these.
-Will need a 72 record of completion once finaled.
-Need to test water flow and tamper.
-Need to verify all signals with central station.
-Correct timestamp on panel.
-Need waterflow tested and passed by monday or tuesday morning.
ok for TCO for full occupancy