Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2019 | ELECTRIC - RECONNECT | Approved | , OK to clear electric RECN | |
| 05/20/2019 | ELECTRIC - RECONNECT | Denied | 1- Shall provide a number 4 copper Ufer ground conductor to be continuous to the bus bar. 2- Shall provide cover blanks for all bused openings in the service panel. |
|
| 05/06/2019 | ELECTRIC - RECONNECT | Denied | Service not grounded Interior lighting not installed to code omit lighting or installed to code Post address numbers visible from street |
|
| 04/25/2019 | ELECTRIC - RECONNECT | Denied | 1- Shall provide a dead from panel for the service panel. 2- Shall cap all unused openings in service panel. |
|
| 04/25/2019 | ELECTRIC - RECONNECT | Denied | 1- Shall provide a dead from panel for the service panel. 2- Shall cap all unused openings in service panel |
|
| 04/24/2019 | ELECTRIC - RECONNECT | Denied | no access recall |