Inspection Status: Passed
Inspection History: COT - LCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 09/03/2019 |
COT - LCPL - Plumbing Intermediate |
MRAMBER |
Approved |
Entered by DMERANZ1 - |
| 08/22/2019 |
COT - LCPL - Plumbing Intermediate |
RCHANDLER |
Not ready for Inspection |
Entered by DMERANZ1 - 1-Water heater is installed in room with opening less than 24" wide per M1305.1.1.
2-Need a minimum of 18" of copper from water heater before transitioning to pex.
3-Remove insulation to allow completion of inspection.
4-several studs have been over-notched or over-drilled per R602.6. |
| 08/19/2019 |
COT - LCPL - Plumbing Intermediate |
RCHANDLER |
Not ready for Inspection |
Entered by DMERANZ1 - Work incomplete at this time. |