Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2019 | BUILDING PRE-SLAB | Approved | ||
| 06/06/2019 | BUILDING PRE-SLAB | Not ready for Inspection | 1- Shall provide foam wrap on all plumbing risers thru concrete 2- Shall provide directional fittings for the lavatory waste lines. 3- Shall install the shower waste line to connect to the 3 inch horizontal to horizontal. |