Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 07/05/2019 | PLUMBING - INTERMEDIATE | Correction Required | Tub is full and ABS piping is not. Fill “all” ABS to roof for water and pressure test. Screws required in all water closet rings at floor. Caulk/ Seal all sole plate pipe penetrations including UFER area; Ratproofing Shower pan or til e not installed, call this installation and water test in as a 03075 when ready. Plumbing Progress. |