Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2019 | ELECTRIC - SERVICE UPGRADE | Approved | Will see labeled breakers at final TEP Clearance, INCR |
|
| 05/08/2019 | ELECTRIC - SERVICE UPGRADE | Correction Required | For Clearance the new panel must have 2 Ground Rods a minimum of 6’ apart, Water Bond, Gas Bond, and #4 GEC System based on service entrance cable size in NEC or IRC tables. TEP does not want cable mast guy wires, they want hard pipe EMT style mast bracing. Breaker labeling and sub panel wiring can be seen at final. |