Permit: T19CM02594

Parcel: 11623063C


Addresses:

960 S FREEWAY #03

Inspection Status: Approved

Inspection History: PLUMBING - ABOVE CEILING

Date Description Inspector Results Comments
05/13/2020 PLUMBING - ABOVE CEILING Approved
10/10/2019 PLUMBING - ABOVE CEILING Partial Approval 1- This Inspection is for the 8 and 10 inch area drains located in the courtyard between the buildings 2 and 3 up to the catch basins.
07/16/2019 PLUMBING - ABOVE CEILING Partial Approval 1- This inspection is for bldg. C 1st and 2nd floor only.
2- Water test provided for shower bases in bldg B rooms 111,113,115,117 only.
07/08/2019 PLUMBING - ABOVE CEILING Partial Approval 1- Underground and in wall DWV system is okay. Water test provided.