Permit: T19CM02593

Parcel: 11623063C


Addresses:

960 S FREEWAY #02

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
05/13/2020 PLUMBING - INTERMEDIATE Approved
09/26/2019 PLUMBING - INTERMEDIATE Not ready for Inspection Called Gene site superintendent, he is in Mexico. He stated he would call the tile guy to come show me what was to be inspected. The tile guy left at 1 pm and was not returning to site today. Called Matt and left a message stating to recall inspection since no one on site had keys our knew what it was I was to inspect or look at, asked to leave message when it was called next time.
08/26/2019 PLUMBING - INTERMEDIATE Partial Approval Bldg B, shower pans west side second floor
08/21/2019 PLUMBING - INTERMEDIATE Partial Approval 1- Shower base water test provided for the 2nd floor East bldg. B only.
08/01/2019 PLUMBING - INTERMEDIATE Partial Approval 1- Shower base water test provided west bldg. west side of bldg.only.
06/25/2019 PLUMBING - INTERMEDIATE Partial Approval Except shower pans
06/21/2019 PLUMBING - INTERMEDIATE Not ready for Inspection Work not complete enough to inspect