Permit: T19CM02534

Parcel: 117033170


Addresses:

301 E 4TH ST


Inspection Status: Not ready for Inspection

Inspection History: ELECTRIC - FINAL

Permit Number - T19CM02534

Inspection Description - ELECTRIC - FINAL

Inspection Status - Not ready for Inspection

Date Description Inspector Results Comments
04/15/2019 ELECTRIC - FINAL Not ready for Inspection 1- Work is incomplete
Clear electric INCR
04/11/2019 ELECTRIC - FINAL Not ready for Inspection expose heads of ground rods. Electrical underground from main panel to sub panel was never inspected. Two Conduit’s into subpanel both appear to be overloaded. No more than half an inch sheathing into panel on Romex. Sub panel needs to be labeled. It appears that all work was done hot as there is no inspection history and new panel already hot. Contractor asked for a 30 minute call ahead, voicemail box was full.