Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
Permit Number - T19CM02534
Inspection Description - ELECTRIC - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/15/2019 | ELECTRIC - FINAL | Not ready for Inspection | 1- Work is incomplete Clear electric INCR |
|
04/11/2019 | ELECTRIC - FINAL | Not ready for Inspection | expose heads of ground rods. Electrical underground from main panel to sub panel was never inspected. Two Conduit’s into subpanel both appear to be overloaded. No more than half an inch sheathing into panel on Romex. Sub panel needs to be labeled. It appears that all work was done hot as there is no inspection history and new panel already hot. Contractor asked for a 30 minute call ahead, voicemail box was full. |