Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 05/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | Gas line not allowed in footing or under slabs. See IFGC for an approved method of installation. Line drawing maybe required for correct installation. Appears this gas line may also be under an enclosed patio structure, which is in violation of the code |
|
| 04/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Need plan on site in a visible location in order to perform inspection. SWG has been asked to visit site to determine if gas line in west footing has been abandoned or not. Please recall inspection. |