Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2020 |
FRAMING |
|
Approved |
|
| 12/05/2019 |
FRAMING |
|
Not ready for Inspection |
|
| 12/04/2019 |
FRAMING |
|
Cancelled |
Cancel by contractor |
| 11/27/2019 |
FRAMING |
|
Not ready for Inspection |
No approved truss drawing. Missing H2.5 clips. Missing nails on north east side in sheathing. STOPPED INSPECTION |