Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 09/17/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
|
| 07/01/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
please revise plans reflecting new footing locations |
| 06/11/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
footings need rebar installed. Also one of the posts that will be for the carport is right in front of the electrical panel and right next to the gas meter. 3 feet required in front of electrical panel (IRC E3405.1) Typically there is also 3 foot of clearance around a gas meter as well. This needs to be addressed before proceeding any further. |