Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 06/20/2019 |
COT - LCBU - Framing |
MHASSAN |
Approved |
Entered by DMERANZ1 - |
| 06/19/2019 |
COT - LCBU - Framing |
AKLEINSORGE |
Partial Approval |
Entered by DMERANZ1 - 1. Shim floor trusses along front entry wall
2. Need FHA strap at 3 top plate over bore locations on 1st level
3. Nail protection plate on dwv line at 2nd level near stairs
4. Fire foam penetration in master bedroom closet and around waste line in guest bathroom
5. Floor truss in garage needs hanger installed at Glue lam or be stitched to other floor truss completely |