Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2019 | ELECTRIC - FINAL | Approved | OK to clear electric RECN, this is a second clearance turned in as the main breaker was not tied in originally | |
| 04/26/2019 | ELECTRIC - FINAL | Partial Approval | TEP is requiring a disconnect on the line side so there will be an additional power kill to come, and an additional clearance will be needed to be turned in | |
| 04/08/2019 | ELECTRIC - FINAL | Denied | Expose both ground rods for inspection Gas bond to be on house side of diaphragm Left message |