Inspection History Details
Inspection Status: Not Applicable
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2019 | ELECTRIC - RECONNECT | Not Applicable | ||
| 05/09/2019 | ELECTRIC - RECONNECT | Correction Required | 2 ground rods, water bond and gas bond required. Label all breaker functions. Re-thread service mast as present is cross threaded ; this may require a power cut. Level up panel and install all weather tight Ferrell’s on emt branch lines leaving the panel. If power cut then service entrance cables should be updated to 2/0 copper or 4/0 aluminum as required for a 200 amp Panel. |