Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2020 | ELECTRIC - CONSTRUCTION POWER | Approved | ||
| 04/01/2020 | ELECTRIC - CONSTRUCTION POWER | Correction Required | Install labels on all meters. |