Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - LCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2019 |
COT - LCPL - Plumbing Intermediate |
DMUNIZ |
Approved |
Entered by DMERANZ1 - |
| 10/01/2019 |
COT - LCPL - Plumbing Intermediate |
TVALENCIA |
Denied |
Entered by DMERANZ1 - 1- Second Floor Sanitary waste and vent does not set the requirements for horizontal wet venting per Section P3108 2012 IRC
2- Water lines to close to electric can lights
3- Retest the Sanitary system
4- Approved plans call out for the water supply line to the water heater shall be 11/4 inch in size. This is due to the wfu load of the hot water distribution. |
| 09/27/2019 |
COT - LCPL - Plumbing Intermediate |
DMUNIZ |
Denied |
Entered by DMERANZ1 - Repair damaged Pex lines (multiple locations). Provide DWV and Potable water test. |