Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Passed
Inspection History: COT - LCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2019 |
COT - LCPL - Plumbing Intermediate |
DMUNIZ |
Approved |
Entered by DMERANZ1 - |
| 10/01/2019 |
COT - LCPL - Plumbing Intermediate |
TVALENCIA |
Denied |
Entered by DMERANZ1 - 1- Second Floor Sanitary waste and vent does not set the requirements for horizontal wet venting per Section P3108 2012 IRC
2- Water lines to close to electric can lights
3- Retest the Sanitary system
4- Approved plans call out for the water supply line to the water heater shall be 11/4 inch in size. This is due to the wfu load of the hot water distribution. |
| 09/27/2019 |
COT - LCPL - Plumbing Intermediate |
DMUNIZ |
Denied |
Entered by DMERANZ1 - Repair damaged Pex lines (multiple locations). Provide DWV and Potable water test. |