Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 09/27/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Work incomplete upon arrival. | |
| 09/24/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Second Floor water closet does not comply with the horizontal wet venting requirements. 2- Approved plans call for the 1 1/4” cold supply go all the way to the water heater. 3- 3/4 inch water line is crossing the truss gusset plate over the kitchen area. |
|
| 09/20/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Contractor rescheduled Via phone call |