Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/25/2022 |
ENGINEERING - FINAL |
|
Approved |
Approved |
| 10/14/2021 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Not ready. Corrections and plan revision requested by Dave Roberts on February 4, 2020. No contact information provided for inspection. |
| 02/04/2020 |
ENGINEERING - FINAL |
|
Partial Approval |
ROOF DRAINAGE IS NOT PER THE APPROVED PLANS. THE APPROVED PLAN SHOWS THAT ALL WATERS WILL DISCHARGE AT A SINGLE POINT EAST OF THE PEDESTRIAN ACCESS DOOR LOCATED AT THE SOUTH EAST CORNER OF THE NEW STRUCTURE. THERE ARE MULTIPLE DOWN SPOUTS THAT DUMP INTO THE PEDESTRIAN ACCESS AREAS. PROVIDE A APPROVED REVISED PLAN FOR ALL CHANGES MADE TO THIS SITE WHEN THE NEXT INSPECTION IS SCHEDULED FOR THIS SITE. THE AREA AROUND THE SOUTHERN STRUCTURE IS NOT COMPLETE AT THIS TIME, MISSING GRADING, DRAINAGE, AND ASPHALT AT TIS TIME. COMPLETE ALL WORK AND PROVIDE A APPROVED REVISED DRAWINGS WHEN THIS INSPECTION IS RESCHEDULED FOR THE FINAL C OF O OR TCO. OK FOR A TCO FOR THE EASTERN 2 BAYS AND THE EASTERN HALF OF THE SOUTHERN BAYS AT THIS TIME, FINAL NOT TO BE GIVEN TILL THE SITE TILL A RE-INSPECTION IS DONE WITH THE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE. |