Permit: T19CM02103

Parcel: 11007414D

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T19CM02103

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/12/2020 ENGINEERING - FINAL Approved
01/14/2020 ENGINEERING - FINAL Not ready for Inspection THIS SITE WAS INSPECTED AND IS NOT ABLE TO BE COMPLETE TILL THE WORK IS COMPLETED AS SHOWN ON THE APPROVED PLANS. CURRENTLY THE ISSUE IS THAT THE TRUNCATED DOMES HAVE NOT BEEN INSTALLED ON THE HANDICAP ACCESS RAMP AS NOTED IN NOTE #38 OF THE PLANS. THE ENGINEER OF RECORD HAS CONTACTED ME AND WILL BE WORKING WITH WELLS FARGO TO ENSURE THAT THIS WORK IS COMPLETED IN A TIMELY MANNER.
12/18/2019 ENGINEERING - FINAL Not ready for Inspection Call Nick, message left message for Nick to call me no return phone call. The drop off to the east in the ADA parking at the fan parking location which there is no Vin sign van sign needs to be installed and the drop off area to the most furthest east of the 88 parking cannot be over 2%In any direction.
12/09/2019 ENGINEERING - FINAL Not ready for Inspection Complete notes from last inspection about slopes being out of compliance. Before calling for final.
11/08/2019 ENGINEERING - FINAL Partial Approval OK FOR A TCO FOR OCCUPANCY. THE EXISTING EAST ADA PARKING SPACE AND AREA EAST OF THIS PARKING SPACE IS NON-COMPLIANT AT THIS TIME, CURRENT SLOPES ON THE NORTHERN HALF IS 2.4% TO 3.4% IN THE CROSS SLOPES AND RUNNING SLOPES. PRIOR TO THE FULL RELEASE OF THIS PERMIT IT WILL BE REQUIRED THAT THE ADA PARKING SPACES AND ACCESS AISLES WILL BE COMPLIANT.