Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMPORARY POLE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2019 | ELECTRIC - TEMPORARY POLE | Approved | Power from man Texas Instruments Building. Poles with overhead to modular office site. Transformer, 2 rods, and bonding, to sub panels and disconnect. TEP was called, message with Natalie. TEP Clearance, TMPP |