Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM02056
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/20/2020 | ENGINEERING - FINAL | Approved | Approved | |
10/12/2020 | ENGINEERING - FINAL | Partial Approval | IS PARTIAL AT THIS TIME PENDING THE CLOSURE OF THE DEVELOPMENT PACKAGE DP19-0077 | |
09/30/2020 | ENGINEERING - FINAL | Partial Approval | Partially approved. No message provided. Less communication with superintendent was on August 10. Waiting for contractor to schedule inspections for the development package and sign permits. | |
08/14/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Andrew with Itsa contracting at 343-9009. Complete the work shown on development package permit 19 Dash0077. Schedule for all inspections required to do that activity. Please schedule or provide history of sign inspections. Provide a letter from your engineer of record certifying site grading and all below ground stormwater piping and that your trash enclosure was built in accordance with City of Tucson standard detail 601 as required, because no inspections were performed for your civil drawings and development package permit. | |
08/14/2020 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO, BUT THE FINALIS NOT TO BE GIVEN TILL ALL INSPECTIONS HAVE BEEN INSPECTED AND APPROVED FOR DP19-0077. THIS SITE HAS NOT HAD THE SITE INSPECTIONS DONE DURING CONSTRUCTION, ONLY THE BUILDING INSPECTIONS HAVE BEEN SCHEDULED AND COMPLETED. SEE ALL PREVIOUS COMMENTS FOR SOME OF THE ITEMS, O . WE WILL NEED THE FOLLOWIING ITEMS THAT ARE LISTED BELOW 1) APPROVED REVISED DRAWINGS FOR THIS SITE WHEN THIS SITE IS SCHEDULED. 2) A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL ITEMS ON THIS SITE THAT ARE COMPLETE AT THIS TIME THAT THAT HAVE NOT BEEN PREVIOUSLY INSPECTED AND APPROVED BY THIS DEPARTMENT. 3) WE WILL NEED THE NOTIFICATION OF TERMINATION LETTER FOR THIS SITE FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. ALL OF THE REMAINING INSPECTIONS WILL NEED TO BE SCHEDULED NEXT WEEK SO THAT WE CAN DO A FULL AND COMPLETE INSPECTION OF THIS SITE. |
|
08/12/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Unscheduled Inspection to review plans. Contractor needs to schedule all require inspections on developing package permit additionally monument sign permit has not been inspected either. Will require letters certification from registered engineer of record for all work completed without inspection | |
08/10/2020 | ENGINEERING - FINAL | Denied | . Denied. There is no history of any inspections of development package DP19 Dash0077. Please provide contact information on scheduling inspection. Please schedule required inspections from development package permit. |