Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2019 | ELECTRIC - PROGRESS | Approved | Cleared (RECN). Transformer is customer owned no TEP Clearance is required at this time, record for PDSD. Inspection called for Line side tap in Existing Transformer, from New 800AMP PV Utility Disconnect. (DGL) to be issued at Final Inspection. 3 Parallel sets of 480V #500 KCMIL Conductors, 1/0 GRND. Lugs torqued at 32 PSI. All work meets NFPA70 (2017 NEC), and local jurisdiction Requirements. Note: Check for $165 collected upon arrival for after hours inspection. |