Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2019 |
FRAMING |
|
Approved |
|
| 07/15/2019 |
FRAMING |
|
Partial Approval |
CHANGE TO PARTIAL FOR PORCH ENCL REVISION INSPECTION |
| 07/12/2019 |
FRAMING |
|
Cancelled |
IVRS - AP canceled |
| 07/01/2019 |
FRAMING |
|
Not ready for Inspection |
All roof top duct to have 2 inch liner, provide fire blocking at existing wall, provide bird blocking at new wall, remove blocking at existing opening above ceiling, provide smoke alarms per plan, sheathing not properly nailed, Seal all penetrations through top plating, waste piping not on test, |
| 06/28/2019 |
FRAMING |
|
Cancelled |
IVRS - AP canceled |
| 06/11/2019 |
FRAMING |
|
Not Applicable |
full combination inspection required to do framing |
| 06/10/2019 |
FRAMING |
|
Cancelled |
Cancelled, per phone call from COT-Office |