Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2019 | PLUMBING - GAS PRESSURE TEST | Approved | Gas reconnect OK to clear. | |
| 04/02/2019 | PLUMBING - GAS PRESSURE TEST | Partial Approval | Pressure test OK, water heater flue pipe in disrepair, must be repaired prior to release of gas | |
| 04/01/2019 | PLUMBING - GAS PRESSURE TEST | Correction Required | GAT to be pumped up and ready for inspection when inspector arrives. Gas pipe to be a min of 3" above the roof surface on treated wood or other Approved. Gas pipe to be secured every 8 Feet. |