Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2019 | ELECTRIC - INTERMEDIATE | Approved | ||
| 07/18/2019 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | Too many items to list beyond previous inspection results, walked project with builder,Recall when all issues have been addressed. | |
| 07/17/2019 | ELECTRIC - INTERMEDIATE | Denied | 1- Plumbing is incomplete. 2- Shall seal the top plate electric conductors penetrations with fire rated foam or caulk. 3- Shall provide (3) sided blocking for all forced air vents. 4- Shall remove the fernco coupling located at the front South East wall and provide a mission specialty coupling. 5- Shall provide a minimum of 12 inches of separation of the water lines to the can lights. |