Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2019 | ELECTRIC - RECONNECT | Partial Approval | OK to clear electric RECN. receptacle below panel needs to be a GFCI. This is for construction power only in order to finish fixing up house | |
| 03/25/2019 | ELECTRIC - RECONNECT | Not ready for Inspection | receptacle below panel needs to be a GFCI. Construction breaker needs to be labeled and be the only breaker tied into the panel, as house is unsafe and should not be hot | |
| 03/22/2019 | ELECTRIC - RECONNECT | Not ready for Inspection | house has many unsafe conditions, stopped inspection. Recommended to contractor as it was an obvious remodel that he set up the panel for a construction power setup in order to get clearance. | |
| 03/20/2019 | ELECTRIC - RECONNECT | Denied | Omit zip cords from exterior carport and front porch Exterior outlet at carport not to code Provide access to building no message left for entry |