Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2019 | REINFORCED MASONRY PRE-GROUT | Approved | ||
| 06/28/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Complete second bond beam Above doors and windows. | |
| 06/27/2019 | REINFORCED MASONRY PRE-GROUT | Correction Required | No plans or ladder on site. Recall when ready. |
|
| 06/18/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | First Lyft OK | |
| 06/10/2019 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Incorrect rebar and lay out | |
| 06/04/2019 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Vertical bars required at either side of openings, bond wire required every 16 inches Of lift, provide clarification documentation. |