Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2019 | PLUMBING - FINAL | Approved | Clear gas meter Verbal clearance called in 2:00 pm |
|
| 04/19/2019 | PLUMBING - FINAL | Not ready for Inspection | Work is incomplete | |
| 04/17/2019 | PLUMBING - FINAL | Denied | 1- Shall install the water heater at time of final inspection. 2- Shall provide a gas bond on system 3- Shall hard pipe thru the furnace housing the locate the flex connector and gas shut off valve. 4- Shall secure and strap down gas piping. 5- Shall provide a carbon monoxide detector located in hallway. 6- re test the system. |