Inspection History: PLUMBING - GAS RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2019 | PLUMBING - GAS RECONNECT | Approved | ||
| 04/19/2019 | PLUMBING - GAS RECONNECT | Not ready for Inspection | Work is incomplete | |
| 04/17/2019 | PLUMBING - GAS RECONNECT | Denied | 1- Shall install the water heater at time of final inspection. 2- Shall provide a gas bond on system 3- Shall hard pipe thru the furnace housing the locate the flex connector and gas shut off valve. 4- Shall secure and strap down gas piping. 5- Shall provide a carbon monoxide detector located in hallway. 6- re test the system. |
|
| 03/19/2019 | PLUMBING - GAS RECONNECT | Denied | 1- The gas pressure test was below the required pressure of 3 psi, check system for leaks. 2- Shall connect all gas appliances. 3- Shall obtain a water heater permit. 4- Shall hard pipe thru the furnace housing then connect he gas shut off valve, sediment trap and flex connector. 5- Shall provide a carbon monoxide detector for both hallways that lead to the bedrooms. 6- A gas Water Heater Shall not be located in the bedroom closet and requires combustion air vents that do not communicate to the bedroom. |
|
| 03/15/2019 | PLUMBING - GAS RECONNECT | Not ready for Inspection | System not under test |