Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2019 | PLUMBING - ROUGH, SOIL | Approved | Ok to proceed | |
| 10/21/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall locate the outlet of the vent to be above the center line of the drain at the North water closet and both Showers. Reference section P3104.3 2018 IRC. 2 Retest the system. 3- The sewer tracer wire shall terminate at the Two Way Clean Out and be exposed above grade. |
|
| 10/18/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- The vents to the water closets and showers are located in the wrong place. The vents for the showers shall be located downstream of the the traps and shall uses wye fitting for the vent to the water closets. 2- Re test the system. 3- Shall provide tracer wire for he bldg.sewer. |