Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2020 | ELECTRIC - FINAL | Approved | ||
| 02/07/2020 | ELECTRIC - FINAL | Denied | 1- Shall post address on bldg. 2- Shall label all circuit breakers in the service panel. 3- Shall provide locking caps on the condenser refrigerant service ports . 4- Shall secure the liquid tight whip to the condenser. 5- Shall protect the insulation on the condenser line set. 6- Shall provide a water hammer arrestor for the dishwasher water supply. 7- Shall provide approved material for the Water Heater T & P drain and terminate it to the Mop Sink with a one inch air gap. 8- Water Heater has a leak. 9- Shall provide a Water Hammer Arrestor for the Clothes Washer. |