Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
| 10/11/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Job site was locked no access.4:36 pm. | |
| 10/10/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Reference comments from previous inspection. | |
| 10/08/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall install the Island Sink Venting as per P-3112 2018 IRC. 2- The 2 inch combo on the Bathroom 2 waste line is reversed and not in a drainage position. 3- Retest the system. |