Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
| 07/31/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | From HCS connection to double clean-out. | |
| 06/05/2019 | PLUMBING - ROUGH, SOIL | Correction Required | Note: Partial inspection only of main house. 1-Tub in guest bath has dry vent connection below the centerline of drain. 2 -Provide bell hole for inspection at all joints to allow for 360 degree inspection. |