Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2019 | ELECTRIC - SERVICE UPGRADE | Approved | Clearance TEP INCR. | |
| 07/16/2019 | ELECTRIC - SERVICE UPGRADE | Correction Required | This is a new service panel and relocated outside the new addition. 2 ground rodsrequired to be a min of 6’ apart, these are 5’3" /-. A gas bond is required as is a water pipe bond. GEC to be #4 if copper. |