Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2019 | FRAMING | Approved | ||
| 07/12/2019 | FRAMING | Denied | 1- Shall provide the required H25 clips and strap down the gluelam beam per detail. |