Inspection Status: Correction Required
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/28/2019 |
ELECTRIC - FINAL |
|
Correction Required |
1-Overhead conductors are resting on carport roof. 2-Provide permit for carport of combustible construction to South property line, and has untreated posts buried in dirt, or remove the construction in violation. 3-Install grounding electrode conductor and ground rods per Code. 4-Service has more than six disconnects allowed byE3601.7. 5-Provide verification from TEP that sub-metering is acceptable. |