Inspection Status: Correction Required
Inspection History: ELECTRIC - RECONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 03/07/2019 |
ELECTRIC - RECONNECT |
|
Correction Required |
THE ISSUES RAISED BY RCHANDLER ON 2/23/19 WERE ADDRESS BY PHONE WITH THE PROPERTY MANAGER. BECAUSE THE PERMIT IS FOR ELECTRIC RECONNECT ONLY, THE CARPORT BUILT ON THE PROPERTY LINE CANNOT BE ADDRESSED. ELECTRICAL CORRECTIONS MUST BE MADE PER 2/28 REPORT PRIOR TO RECONNECTION OF ELECTRIC PANEL. PROPERTY MANAGER HAD SUB METER CHECKED BY TEP TECH, AND WAS FOUND TO BE APPROVED. |
| 02/28/2019 |
ELECTRIC - RECONNECT |
|
Correction Required |
1-Overhead conductors are resting on carport roof. 2-Provide permit for carport of combustible construction to South property line, and has untreated posts buried in dirt, or remove the construction in violation. 3-Install grounding electrode conductor and ground rods per Code. 4-Service has more than six disconnects allowed byE3601.7. 5-Provide verification from TEP that sub-metering is acceptable. |