Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | Two pour, slab will be called in later. Stem wall to be 1 course. SSTB’s in place |
|
| 03/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Arch plans req hold down options not installed yet. Homeowner will clarify all with architect and framer to get all hardware installed for a two pour situation. |