Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T19CM01296
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/01/2019 | PLUMBING - INTERMEDIATE | Approved | All corrections are complete | |
04/30/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | All corrections not complete. Plus ceiling light fixture box will need to be reattached in master bedroom closet, looks like it was removed during duct block out. |
|
04/29/2019 | PLUMBING - INTERMEDIATE | Partial Approval | 1. Secure toilet flanges in both bathrooms. 2. Foam all top plate penetrations. 3. Need blocking at all duct boots. 4. Need to nail H2.5 clips on interior bearing wall. 5. Install anchor bolt in garage at hold down. |